To consider the report of the City Development Manager.
Minutes:
The Principal Project Manager (Development) (MD) presented the application for construction of care facility (66 beds) with associated means of access, access road, car parking, landscaping and associated infrastructure. He stated that the access to Cumberland Way would cross a shared pedestrian/cycle path and necessitate the relocation of a bus shelter.
Since the drafting of the report, comments on the conditions had been received from the applicant. The requests to amend conditions 3, 5 and 6 slightly were supported by officers, but the requests to amend conditions 8, 10, 13 and 14 including changing BREEAM excellent to very good were not supported.
The recommendation was for approval, subject to the conditions as set out in the report with the amendments to conditions 3, 5 and 6 requested by the developer.
RESOLVED that planning permission for construction of care facility (66 beds) with associated means of access, access road, car parking, landscaping and associated infrastructure be APPROVED, subject to the following conditions:-
(1) Standard Time Limit – Full Planning Permission
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted.
Reason: To comply with Section 91(1)(a) of the Town and Country Planning Act 1990 (as amended).
(2) Approved Plans
The development hereby permitted shall be carried out in complete accordance with the approved plans listed below, unless modified by the other conditions of this consent:
· Location Plan 1:1250
· Draft Site Plan (05/08/2017 01)
· Proposed Plans (05/08/2017 02)
· Elevations Sheet 1 (05/08/2017 03)
· Elevations Sheet 1 (05/08/2017 04)
· Landscape Scheme (314.1 Rev 0)
· Preliminary Access Design Option 1 (162471_PHL_01 Rev F)
Reason:To ensure the development is constructed in accordance with the approved plans.
Pre-Commencement Details
(3) Cycle Parking 1
Notwithstanding the approved plans in condition 2, prior to the commencement of the development hereby permitted, other than preliminary groundworks and drainage works, details of the location and design of cycle parking for staff as well as showers, lockers and space to dry clothes for staff shall be submitted to and approved in writing by the Local Planning Authority. These details shall be provided in the development as approved.
Reason: To accord with paragraph 5.3.1 of the Sustainable Transport SPD in the interests of sustainable transport. These details are required pre-commencement as specified to ensure that these facilities are provided in the building.
(4) Surface Water Drainage Management System (Construction)
No part of the development hereby permitted shall be commenced until the detailed design of the proposed surface water drainage management system which will serve the development site for the full period of its construction has been submitted to and approved in writing by the Local Planning Authority, in consultation with Devon County Council as the Lead Local Flood Authority. This temporary surface water drainage management system must satisfactorily address both the rates and volumes, and quality, of the surface water runoff from the construction site. The approved surface water drainage management system shall be implemented and maintained throughout the construction period.
Reason: To ensure that surface water runoff from the construction site is appropriately managed so as to not increase the flood risk, or pose water quality issues, to the surrounding area. (Advice: Refer to Devon County Council’s Sustainable Drainage Guidance.) These details are required pre-commencement as specified to ensure that an appropriate drainage system is provided for the construction stage.
(5) Detailed Permanent Surface Water Drainage Scheme
(6) Ambient noise levels from transport sources
Prior to the commencement of the development hereby permitted, other than preliminary groundworks and drainage works, an Acoustic Design Statement shall be submitted to and approved in writing by the Local Planning Authority. Any necessary mitigation measures required shall be implemented in full prior to occupation of the development, and maintained thereafter. (Advice: The Professional Practice Guidance Note (ProPG): Planning and Noise for New Residential Development May 2017 (ANC, IoA and CIEH) describes the expected content and approach of an Acoustic Design Statement.)
Reason: In the interests of residential amenity. These details are required pre-commencement as specified to ensure that any mitigation measures are incorporated into the construction of the building.
(7) District Heating Network
Unless it is demonstrated in writing prior to commencement that it is not viable or feasible to do so, the building comprised in the development hereby approved shall be constructed in accordance with the CIBSE Heat Networks Code of Practice so that its internal systems for space and water heating are capable of being connected to the proposed decentralised energy (district heating) network. Prior to occupation of the development, the necessary on-site infrastructure, including appropriate space for plant and machinery, shall be put in place for connection of those systems to the network at points at the application site boundary agreed in writing by the Local Planning Authority.
Reason: To ensure that the proposal complies with Policy CP13 of the Core Strategy and paragraph 96 of the NPPF, and in the interests of delivering sustainable development. If it is demonstrated that it is not viable or feasible to construct the building in accordance with the CIBSE Heat Networks Code of Practice, this information must be provided to the Council prior to commencement of the development because it will affect the construction of the building.
(8) BREEAM
Unless otherwise agreed in writing by the Local Planning Authority the building hereby approved shall achieve a BREEAM ‘excellent’ standard as a minimum, and shall achieve ‘zero carbon’ if commenced on or after 1st January 2019. Prior to commencement of development of the building the developer shall submit to the Local Planning Authority a BREEAM design stage assessment report to be written by a licensed BREEAM assessor which shall set out the BREEAM score expected to be achieved by the building and the equivalent BREEAM standard to which the score relates. Where this does not meet the BREEAM minimum standard required by this consent the developer shall provide prior to the commencement of development of the building details of what changes will be made to the building to achieve the minimum standard, for the approval of the Local Planning Authority to be given in writing. The building must be completed fully in accordance with any approval given. A BREEAM post-completion report of the building is to be carried out by a licensed BREEAM assessor within three months of substantial completion of the building and shall set out the BREEAM score achieved by the building and the equivalent BREEAM standard to which such score relates.
Reason: To ensure that the proposal complies with Policy CP15 of the Core Strategy and in the interests of delivering sustainable development. The design stage assessment must be completed prior to commencement of development because the findings may influence the design for all stages of construction.
(9) Construction Method Statement
No development (including ground works) or vegetation clearance works shall take place until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority. The Statement shall provide for:
(a) The site access point(s) of all vehicles to the site during the construction phase.
(b) The parking of vehicles of site operatives and visitors.
(c) The areas for loading and unloading plant and materials.
(d) Storage areas of plant and materials used in constructing the development.
(e) The erection and maintenance of securing hoarding, if appropriate.
(f) Wheel washing facilities.
(g) Measures to control the emission of dust and dirt during construction.
(h) No burning on site during construction or site preparation works.
(i) Measures to minimise noise nuisance to neighbours from plant and machinery.
(j) Construction working hours and deliveries from 8:00 to 18:00 Monday to Friday, 8:00 to 13:00 on Saturdays and at no time on Sundays or Bank Holidays.
The approved Statement shall be strictly adhered to throughout the construction period of the development.
Reason: To ensure that the construction works are carried out in an appropriate manner to minimise the impact on the amenity of neighbouring uses and in the interests of the safety and convenience of highway users. These details are required pre-commencement as specified to ensure that building operations are carried out in an appropriate manner.
(10) Waste Audit Statement
Prior to the commencement of the development hereby permitted, a Waste Audit Statement shall be submitted to and approved in writing by the Local Planning Authority. This statement shall include all information outlined in the waste audit template provided in Devon County Council’s The development shall be carried out in accordance with the approved statement.
(11) Tree/Hedgerow Protection Measures
No development (including ground works) or vegetation clearance works shall take place until fences have been erected and any other protection measures put in place for the protection of trees and/or hedgerows to be retained around the site boundary in accordance with a Scheme which has been submitted to and approved in writing by the Local Planning Authority. The Scheme shall be prepared in accordance with British Standard BS 5837:2012 (or any superseding British Standard). The fences and any other protection measures required in the approved Scheme shall be retained until the completion of the development and no vehicles, plant or materials shall be driven or placed within the areas enclosed by the fences.
Reason: To protect the trees and hedgerows to be retained around the site boundary, particularly fronting Cumberland Way, in the interests of the amenities of the area and biodiversity, in accordance with Policy LS4 of the Exeter Local Plan First Review and the Trees in Relation to Development SPD (September 2009). These details are required pre-commencement as specified to ensure that trees and hedgerows to be retained are not damaged by building operations or vegetation removal, including their biodiversity interests.
During Construction
(12) Unsuspected Contamination
If, during development, contamination not previously identified is found to be present at the site then the Local Authority shall be notified as soon as practicable and no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until the developer has submitted an investigation and risk assessment, and where necessary a remediation strategy and verification plan, detailing how this unsuspected contamination shall be dealt with. Thereafter and prior to occupation of any part of the development, a verification report demonstrating completion of the works set out in the approved remediation strategy, shall be submitted to and approved in writing by the Local Planning Authority.
Reason: To minimise contamination risks to future users of the site and surrounding land, including controlled waters, and to ensure the development can be carried out safely.
Pre-Specific Works
(13) Materials
Prior to the construction of the external walls of the building hereby permitted, samples and/or product specification sheets, including confirmation of colour, of the external facing materials and roof materials shall be submitted to and approved in writing by the Local Planning Authority. The building shall be constructed in accordance with the approved materials.
Reason: In the interests of design and the character of the area, in accordance with Policy CP17 of the Core Strategy, Policy DG1 of the Exeter Local Plan First Review and paragraph 58 of the NPPF.
(14) Building Details
Prior to the construction of the external walls of the building hereby permitted, details of the following, including confirmation of colour, shall be submitted to and approved in writing by the Local Planning Authority:
(1) External doors
(2) Windows, including depth of reveals
(4) Rain water goods
(5) Fascia, soffit and barge boards
The building shall be constructed in accordance with the approved materials/details.
Reason: In the interests of design and the character of the area, in accordance with Policy CP17 of the Core Strategy, Policy DG1 of the Exeter Local Plan First Review and paragraph 58 of the NPPF.
(15) Bird Boxes
Prior to the construction of the external walls of the building hereby permitted, details of the provision for nesting birds (e.g. swifts, sparrows and/or house martins) shall be submitted to and approved in writing by the Local Planning Authority. The details shall be fully implemented as part of the development and retained thereafter.
Reason: To enhance biodiversity (taking into account the recommendations of the submitted Ecological Assessment).
(16) External Lighting
No external lighting shall be installed on the site or on the building hereby permitted unless details of the lighting have previously been submitted to and approved in writing by the Local Planning Authority (including location, type and specification). The details shall demonstrate how the lighting has been designed to minimise impacts on local amenity and wildlife (including isoline drawings of lighting levels and mitigation if necessary). The lighting shall be installed in accordance with the approved details.
Reason: To ensure lighting is well designed to protect the amenities of the area and wildlife.
Pre-occupation
(17) Detailed Landscaping Scheme
Prior to the first occupation or use of the development hereby permitted, a Detailed Landscaping Scheme for the site shall be submitted to and approved in writing by the Local Planning Authority. The Scheme shall include details of hard and soft landscaping, including all boundary treatments. Where applicable, it shall specify tree and plant species and methods of planting. The hard landscaping shall be constructed as approved prior to the occupation/use of the development. The soft landscaping shall be planted in the first planting season following the occupation/use of the development or completion of the development, whichever is the sooner, or in earlier planting seasons wherever practicable, and any trees or plants which within a period of 5 years from the completion of the development die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of similar size and species.
Reason: In the interests of good design in accordance with Policy DG1 of the Exeter Local Plan First Review and paragraph 58 of the NPPF.
(18) Landscape and Ecological Management Plan (LEMP)
Prior to the first occupation or use of the development hereby permitted, a Landscape and Ecological Management Plan (LEMP) shall be submitted to and approved in writing by the LocalPlanningAuthority. The content of the LEMP shall be prepared in accordance with the specifications in clause 11.1 of BS 42020:2013 (or any superseding British Standard) and shall include the following:
a) Description and evaluation of features to be managed.
b) Ecological trends and constraints on site that might influence management.
c) Aims and objectives of management.
d) Appropriate management options for achieving aims and objectives.
e) Prescriptions for management actions.
f) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five year period).
g) Details of the body or organisation responsible for implementation of the plan.
h) On-going monitoring and remedial measures for biodiversity features included in the LEMP.
The LEMP shall also include details of the legal and funding mechanism(s) by which the long-term implementation of the plan will be secured by the developer with the management body(s) responsible for its delivery.
All post-construction site management shall be undertaken in accordance with the LEMP.
Reason: In the interests of biodiversity and good design in accordance with Policy CP16 of the Core Strategy, Policies LS4 and DG1 of the Local Plan First Review and paragraphs 58, 109 and 118 of the NPPF.
(19) Travel Plan
No part of the development shall be occupied until a Travel Plan (including recommendations and arrangements for monitoring and review) has been submitted to and approved in writing by the Local Planning Authority in consultation with the Local Highway Authority. Thereafter the recommendations of the Travel Plan shall be implemented, monitored and reviewed in accordance with the approved document, or any amended document subsequently approved in writing by the Local Planning Authority.
Reason: To encourage travel by sustainable means, in accordance with Policy T3 of the Local Plan First Review and the Sustainable Transport SPD.
(20) S278 Agreement
The development shall not be occupied or brought into use until a Section 278 Highways Agreement has been entered into in order to secure the necessary works to the public highway. The s278 works shall include, but not be limited to: further details of the proposed vehicle access/raised crossing on Cumberland Way and further details of the relocated bus stop/shelter on Cumberland Way. The works shall be implemented prior to the occupation/use of the development.
Reason: To ensure safe and suitable access is achieved for all users, and to protect the function of the cycle route along Cumberland Way.
(21) Car Parking Provision
No part of the development shall be occupied until all of the car parking spaces and access thereto shown on the approved plans have been provided and made available for use. The car parking spaces shall be kept permanently available for parking and access purposes thereafter.
Reason: To ensure that adequate off-street parking and access thereto is provided and kept permanently available for use in the interests of highway safety and to protect the amenities of the neighbourhood.
(22) Cycle Parking 2
The development shall not be occupied or brought into use until the four cycle loops shown adjacent to the disabled parking spaces on the approved Draft Site Plan have been provided.
Reason: To accord with the Sustainable Transport SPD in the interests of sustainable transport.
INFORMATIVES:
(1) Although not matters contained within the scope of this application, the applicant should be advised to contact the Commercial Section of Environmental Health Services (01392 265148) in order to ensure that the following items will comply with all relevant British Standards, Regulations and guidance:
· Food safety issues - design and layout of the kitchens including fixtures, fittings, storage and ventilation.
· Adequate provision of WCs.
(2) In accordance with paragraphs 186 and 187 of the National Planning Policy Framework the Council has worked in a positive and pro-active way and has imposed planning conditions to enable the grant of planning permission.
Supporting documents: